Project Phase

Concept Select
Pre-FEED
FEED

Disciplines

Process & Facilities
Flow Assurance & Production Chemistry

Location

UKCS

Service

Study

Overview

We were awarded an accelerated project to deliver an early production system solution for our UKCS located operator client.

Scope of Work

We were engaged by our client to deliver a full multi-discipline topsides pre-FEED and FEED for a heavy oil subsea tie-back to an FPSO which was to be used as an early production system. The study included:

  • Modifications to the turret and swivel path
  • Optimisation of the crude inlet heating to improve the separation process
  • Flare gas recovery
  • Implementation of a compression system for gas injection into the disposal wells
  • Diluent storage and injection systems development
  • Establishment of process chemicals, subsea controls, and cargo tank heating solutions
  • Engineering for recertification for asset life extension (ALE)
  • Operational integrity and readiness
  • Cost Estimation
19
Engineers
11
Disciplines
8
Months

Findings

We developed a comprehensive and technically viable solution within an accelerated project schedule. To achieve this a pragmatic approach to the study was taken, optimising the focus of engineering to ensure delivery.

Find Out More

Have questions about this project? Contact us to find out how Infinity can help you with your project.